Excavator Stone Weight
An excavator dug an excavation measuring 10 m × 20 m and 30 cm deep. How many tonnes of stone need to be loaded?
Final Answer:

Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
Tip: Our Density units converter will help you convert density units.
Do you want to convert mass units?
Tip: Our Density units converter will help you convert density units.
Do you want to convert mass units?
You need to know the following knowledge to solve this word math problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Ditch
The excavator dug 40% of the excavation in 2 hours and 20 minutes. How long does it take him to dig the whole ditch? - Excavation by excavators
The excavation for the gas supply to Jarešov would be dug by the first excavator in 9 days. After two days, the second excavator began to work on the excavation. Both excavators together finished the work in another 4 days. a) In how many days would the s - Well excavation transport
The company is to dig a well 25 m deep with a radius of 0.8 m. How many cars that can be loaded with 12 cubic m will be needed to transport the excavated soil if it is calculated that the soil will increase in volume by 10% when excavated? - The excavation
The excavation for the city sewer was 38 m long, 2.2 m wide, and 3 m deep. a) How many cubic meters of soil were dredged b) How many journeys had to be made by one car when removing the soil if they loaded an average of 4.5 m of cubic soil on each journey - Gas pipeline excavation
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120 - Six-tonne truck
The platform of a six-tonne truck is 2.20 m wide and 4.20 m long; the side panels are 0.75 m high. How many cubic metres of gravel could be loaded onto the truck with the load levelled to the top of the side panels? How deep a layer of gravel can be loade - Cesspool pit excavation
The Horniakovs dug a pit for a cesspool in the shape of a cuboid with bottom dimensions of 40*40 dm and a depth of 350 cm. A) How many cubic meters of soil did they dig up? B) The excavated soil was evenly spread and pressed onto a rectangular area measur