Excavation 7913
The excavator dug an excavation measuring 10mx20m and 30 cm deep. How many tons of stone does it need to load it?
Correct answer:
Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
Tip: Our Density units converter will help you convert density units.
Do you want to convert mass units?
Tip: Our Density units converter will help you convert density units.
Do you want to convert mass units?
You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Ditch
The excavator dug 40% of the excavation in 2 hours and 20 minutes. How long does it take him to dig the whole ditch? - Transported 20543
How many cars will the dirt be transported in an excavation 10 m long, 11 m deep, and 70 cm wide if the load capacity of each used car is 2 tons? The clay density is 1,800 kg / m². - Cheops pyramid
The Pyramid of Cheops is a pyramid with a square base with a side of 233 m and a height of 146.6 m. It is made from limestone with a density of 2.7 g/cm³. Calculate the amount of stone in tons. How many trains with 30 twenty-ton wagons carry the stone? - Decelerated 80572
A projectile was weighing 20 g shoots at a speed of 800 m. with -1 being dug 100 mm deep into the masonry. How long does it brake in masonry assuming uniformly decelerated motion?
- Measuring 16183
The load capacity of the truck is 10t. Will it carry 200 oak planks measuring 30 cm, 4 m, and 30 mm at a time if the weight of 1 dm³ of oak wood is 0.7 kg? - Fountain
The stone fountain, which has the shape of a cylinder with a diameter of 3 m, is 70 cm deep. How many m² of stone is wetted with water? - Transported 35203
The zombie column in the shape of a cylinder in the square is 8 m high and has a diameter of 70 cm. I need to find out his weight. This column will be transported by a truck with a load capacity of 8 tons. - One-quarter 58883
The workers dug one-quarter of the excavation on the first day, half the rest on the second day, and the remaining 15 m on the third day. How many meters did they dig on the first and second day? - Dredged 47291
The pit for the pool will be 30 meters long, 15 meters wide, and 2 meters deep. How many cubic meters of clay need to be dredged?
- The excavation
The excavation for the city sewer was 38 m long, 2.2 m wide, and 3 m deep. a) How many cubic meters of soil were dredged b) How many journeys had to be made by one car when removing the soil if they loaded an average of 4.5 m of cubic soil on each journey - Pool tiles
The pool is 25m long, 10m wide, and 160cm deep. How many m² of tiles will be needed on the walls and the pool? How many tiles are needed when one tile has a square shape with a 20cm side? How much does it cost when 1m² of tiles costs 258 Kc? - Kindergarten 11891
The perimeter of the kindergarten garden measures 126 meters. The longer side of the school garden fence broke. How many meters of 180 cm wide mesh does the janitor need to buy to repair it if the shorter side measures 28 meters? - Block-shaped 65944
We have a block-shaped container measuring 20 cm x 30 cm x 45 cm. How many will 5 cm cubes fit in it? - Kilograms 2099
The truck crane has a load capacity of 4 tons. How many kilograms can we overload it if the maximum limit of 115 percent load capacity is allowed?
- Bottom 3129
How many m² tiles do we need to line the walls and bottom of the pool in the shape of a block 25 m long, 10 m wide, and 180 cm deep? - Approximately 44981
The largest Egyptian pyramid has the shape of a regular four-sided pyramid with a base edge of approximately 227 meters and a height of about 140 meters. How many tons of stone did the workers transport to build it? One cube of stone weighs 2500 kg and ne - Abyss
The stone fell into the abyss: 2 seconds after we heard it hit bottom. How deep is the abyss (neglecting air resistance)? (gravitational acceleration g = 9.81 m/s² and the speed of sound in air v = 343 m/s)