Workers
Workers are digging a jump pit in the schoolyard. The pit has a cuboid shape with a length of 5 m, a width of 20 dm, and a depth of 36 cm. They excavate 0.4 cubic meters of soil an hour. How much time (hours and minutes) is needed to excavate this pit?
Result
Result
Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Cross-section 79984
A ditch with a cross-section in the shape of an isosceles trapezoid with bases of 3 m and 5 m and arms of length 2 m is 2.5 meters deep and 10 meters long. How many cubic meters of soil did they have to excavate when digging it? - Rectangular 67604
The Horniakovs dug a pit for a cesspool in the shape of a cuboid with bottom dimensions of 40*40 dm and a depth of 350 cm. A) How many cubic meters of soil did they dig up? B) The excavated soil was evenly spread and pressed onto a rectangular area measur - The well
The well has the shape of a cylinder with a diameter of 2 m. From ground level to water level are 4 meters, and the water depth in the well is 6 m. How many m³ of soil did they dig when digging a well? How many liters of water is in the well? - Cylinder 5123
The well has the shape of a cylinder with a base diameter of 1.2 m. From the surface to the surface, it is 4 m, and the water depth is 3.5 m. How many m³ of soil had to be dug when digging the well? How much is water (in m3) in the well?
- Truncated 43851
The pit has the shape of a regular truncated 4-sided pyramid, the base edges of which are 14m, 10m, and the depth is 6m. Calculate how many m³ of soil were removed when we dug this pit. - Soil pit
Workers dug a pit cube with an edge of 2.5 meters. How many cars shall remove soil if the car suddenly takes 4 m³ of soil? - Digging a pit
The pit has the shape of a regular quadrilateral truncated pyramid. The edges of the bases are 14m and 10m long. The sidewalls form an angle of 135° with a smaller base. Find how many m³ of soil were excavated when digging the pit. - Excavate 3008
The well will have a diameter of 2 m and a depth of 7 m. How many cubic meters of soil need to excavate a well? - Quadrilateral 44731
The pit for ecological waste has the shape of a regular quadrilateral prism. The supporting edge is 5 meters long. The depth of the pit is 3.5 m. The company enlarged the pit by extending the base edges by 50 cm. By how much m³ has the amount of waste tha
- The trench
Calculate how many cubic meters of soil needs to be removed from the excavation in the shape of an isosceles trapezoid. The top width is 3 meters, the lower width is 1.8 m, the excavation depth is 1 m, and the length is 20 m. - Dimensions 81909
The foundation pit for building houses has a face of blocks with dimensions of 10 meters, 10 meters, and 2 meters. After a heavy rain, the water is filled to the brim. The pump pumps out 10 m³ of water in 1 hour. In how many hours will the pit be empty? - Length 6235
Length 25m, width 10m, depth 160 cm. How many square meters are needed to line the pool? - Cross-section 8171
How many m³ of soil is to be excavated when digging a 120 m long ditch, the cross-section of which is an isosceles trapezoid with bases of 2.3 m and 3.3 m, if the depth of the trench is 90 cm? - Harvester
Harvester has a cutting width of 4 m, and harvested grain in the field is 87 meters wide. Harvester moves along the field's length for six minutes; going back (without cutting) takes half the time. Each turn at the end field takes one minute. How many hou
- Trench
The trench is a four-sided prism. The cross-section has a trapezoidal shape with basements of 4m and 6m, and the length of the trench is 30m. What is the depth of the trench if we dig 60,000 l of soil? - Excavation 8581
When building a new road, excavating a 280m long road in the ground was necessary. The bottom width, where the road runs, was 20m wide. At the top, the entire excavation was 30m wide. The depth of the excavation is 6 m. How much m³ of soil had to be remov - Constructing 67634
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120