- Painting
Joseph and Fero painted the bench for four hours. If four friends helped him, how many hours would it take him to work?
- Mukls
The six workers' working group would order jobs completed within 21 working days. How many workers must be added to complete a contract in 14 working days?
- Greenhouses
Two workers would complete the installation of greenhouses for 54 hours. For how many hours does the installation have nine workers?
- Painting school
Redecoration school had scheduled for four crew to 10 days. After two days, a single worker was ill. For how many days was the school painted when remain workers working with the same tempo?
- Five tractors
Five tractors plow the field in 4.8 hours. How long would it take to plow this field if, after 1.5 hours of work, two tractors went to a different field?
- Pumps
The first pump flows 16 liters per second into the basin by the second pump 75% of the first and by the third pump half more than the second. How long will it take to fill the basin with all three pumps simultaneously, a volume of 15 m³ (cubic meters)?
- James
James paints a fence. If he painted every day, instead of 14 planks, he would do 16 one day earlier. How many planks have a fence altogether?
- Weight of air
What is the weight of air in the living room measuring width 6 m, length 4 m, and height 2.56 m? Air density is ρ = 1.2959 kg/m³.
- Train from Prague
The first train from Prague started at 8:00 AM at 40 kilometers per hour. Train from Ostrava started at 9:20 at 80 km per hour. How many hours and how far from cities with trains meet if the distance of cities is 400 km.
- Train from Brno
The first train started from Brno at 8 AM at 60 km per hour. The second train started from Opava at 7 o'clock at 40 kilometers per hour. In how many hours and how far from cities do trains meet when the distance between cities is 200 kilometers?
- Digging companies
Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days, and company D for 24 days. Work began with companies C and D, but after three days, They joined the other two companies. How long did it take to dig a pit?
- Tractors
Six tractors started plowing the field, and work together took 12 days. Agronomist hesitates to: A) after two days, withdraw two tractors or B) after three days, withdraw three tractors. Help him which of these two cases will be plowing done sooner.
- Plan scale
At what scale is the drawn plan of the building, where one side is 45 meters long, and the plan is expressed by a straight line 12 mm long?
- Cuprum
From the 1600 mm long sheet of copper plate 2 mm thickness, we have separated over the whole length of the belt weighing 6000 g. Calculate belt width if one dm³ copper weighs 8.9 kg.
- Workhorses
A team of colleagues did the work in 20 days. After adding two colleagues from the beginning, the team completed the work in 15 days. How many members has the colleague team?
- Journey
The road from A to B measures 11.5 km. Firstly, up the hill, then level plane, and then downhill. Tourists go uphill at 3 km/h, on planes at 4 km/h, and downhill at 5 km/h. From point A to B, it went 2 hours, 54 minutes back, 3 hours, and 6 minutes. How l
- Otto and Joachim
Otto and Joachim go through the woods. After some time, Otto becomes tired and makes 15 minutes stop. Joachim, meanwhile, continues at 5 km/h. When he set off again, Otto had the first running speed of 7 km/h, but it kept only 30 sec, and 1 minute must co
- Three points
Mark three points E, F, and G in the plane, not lie on one line. a) Draw a line segment FG b) Construct halfline (ray) EG c) Draw a line EF
- The sum graphically
Draw a graphical sum of all sides of 4-gon ABCD.
- Freight and passenger car
The truck starts at 8 pm at 30 km/h. The passenger car starts at 8 pm at 40 km/h. Passenger arrives in the destination city 1 hour and 45 min earlier. What is the distance between the city of departure and the destination city?