Algebra - math word problems - page 273 of 305
Number of problems found: 6095
- Salary in enterprise
The average salary in the company is 27,000 CZK. 30% of workers have the lowest average income of 19,000 CZK. The wages in this group increased by 2%. How much did this increase the average wage across the company? - Grandmother currant harvest
The grandmother and granddaughter Julia harvest currants in 15 hours of work together. Julia would harvest currants for ten days after 6 hours of work a day. a) Determine in hours how long the harvest would have taken for her grandmother if Julča had not - Pie ingredient weights
The cookbook by Matěj Matemakak says: The greatest common divisor of flour weight and sugar weight is 15, the greatest common divisor of sugar weight and lemon peel weight is 6, the product of sugar weight and lemon peel weight is 1800, and the smallest c - Cars Meeting Speed
At 10:00 AM, two cars drove against each other from places 240km away. One was driving at an average speed of 70km/h. What was the speed of the other when they met at 11:30? - Divisible number
Six cards with digits 1, 2, 3, 4, 5, and 6 are on the table. Agnes made a six-digit number from these cards, divisible by six. Then she gradually removed the cards from the right. A five-digit number divisible by five remained on the table when she remove - Cream mixture calculation
With cream with a fat content of 36% and milk with a fat content of 3.85%, it is necessary to make 65 liters of whipped cream with a fat content of 33%. How many liters of each of the raw materials do we need? - Tank filling
A worker would fill the tank with one inlet in 36 minutes, the other in 45 minutes. How long will it take to fill the tank if the water flows through the first inlet for 9 minutes and then both simultaneously? - Alcohol preparation
We want to prepare 200g of 64% alcohol. We have a sufficient amount of 80% and 45% alcohol. How many of which will we need? - Mr. Product
The product of ages of all of Mr. Product's children is 1408. The age of the youngest child is equal to half the age of the oldest child. How many children does Mr. Product have, and how old are they? - An aircraft
An aircraft manufacturing company has submitted bids on two separate airline contracts, A and B. The company feels it has a 70% chance of winning contract A and a 25% chance of winning contract B. Furthermore, it believes that winning contract A is indepe - Red cubes
There are 15 white and several red cubes in the box. The probability of accidentally pulling out a white cube is 20%. How many red cubes are in the box? - Combinations 6
Six purses Nine flaps 12 straps Every combination must include one purse, one flap, and one strap. How many are possible combinations? - Journey 5
A man has to make a journey of 84km in 3 hours. He travels the first 30km at 20km/hr. At what rate must he travel the remaining distance to complete his journey on time? - Machines 2
Two machines produce 2,000 products in 50 hours. How many machines do you need to buy to make 15,000 products in 30 hours? - Mason shift sickness
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Hydrogen peroxide dilution
We need a 4% solution of H2O2 (hydrogen peroxide) for the disinfection solution. We only have a 40% solution available. How much water must we add to 100ml of the original solution to obtain the desired concentration? - Excavation machine distribution
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m - Filling tank
The tank is filled to two-thirds of its volume. It will only be half full if we pump 100l of water from it. What is the volume of this tank? - Material transport
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials - Worker production calculation
Two workers produce 138 parts in one shift. At the same time, the first of them produces 30% more than the second. How many components will each have? I need a notation and an equation.
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
