Algebra - math word problems - page 244 of 302
Number of problems found: 6040
- Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Master work
The master will complete the given task in 4 hours. When they're done together, how long will it take to master students entirely in three hours?
- Dwarfs
Four dwarfs would prepare firewood for Snow White in 580 minutes. After an hour and a half, they recruited friends and finished preparing the wood for 280 minutes. How many dwarfs do they recruit?
- Painters
One painter could paint a school for seven days. The second one does it for six days. It was necessary to paint the school in two days. The next painter was invited, and all worked together. How long would this painter paint the school itself?
- Concentration 3097
How many liters of 60% and 80% formic acid do we have to mix to get 80 liters of this acid with a concentration of 65%?
- Increased 83221
There are 12 players on the team, with an average height of 185cm. If the average height of a new player increased by 1cm after he joined the team, what would be his height?
- Trees avg
The worker planted 96 trees on Monday, 120 on Tuesday, and 61 on Wednesday. If he averaged 105 trees per day, how many trees did he plant on Thursday?
- Ostrava 83008
A truck with a speed of 45 km/h left Ostrava. When he had passed 15 km, a car with a 90 km/h speed came behind him. How long does a car catch up with a truck take? How far from Ostrava?
- Kilometers 82735
Fifteen kilometers in front of us, a car travels at a speed of 70 km/h. We drive at an average speed of 100 km/h. How many minutes will it take us to catch up with the car?
- Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work.
- Tourists 81058
Tourists traveled by bus to Croatia. They drove the highway in 8 hours at an average speed of 100 km/h. How fast would they cover it if they walked at an average speed of 120 km/h?
- Characteristics 65294
Kuba wrote down a four-digit number, two evens, and two odds. If he crossed out both even digits in that number, he would get a number four times smaller than if he crossed out both odd digits in the same number. What is the most significant number with t
- Kilometers 63124
At 10:00 AM, a car started from place A at a speed of 70 km/h. 0.5 hours later, a car started from the same point at a speed of 100 km/h. What time did they meet? How many kilometers from point A did they travel before they met?
- Performance 31371
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same)
- Harvesters 18633
Rope wheat harvests seven combine harvesters in 5 days at total capacity. The weather forecast is required to complete the harvest in 4 days. How many combined harvesters had to be used together?
- Simultaneously 12951
They have a swimming pool in the schoolyard. The smaller pump fills in 7.5 hours, the medium in 5 hours, and the large in 3 hours. How many hours will it take if all three are turned on simultaneously?
- Simultaneously 4746
One painter paints the school in 7 days, the other in 6 days. The school had to be painted in 2 days. A third painter was called in, and they all worked simultaneously. In how many days would this third painter paint the school by himself?
- Installation 4123
The team of installers is to carry out the installation in 20 days. By adding two fitters from the beginning of the work, the assembly was completed in 15 days. How many were on the team?
- Calculated 3465
The master calculated that six looms would weave the ordered fabric in 15 hours. One condition appeared. How long before the ordered substance matches the remaining states?
- Modifications 3317
Workshop A can fulfill a specific order in 8 changes, workshop B in 10 modifications. How many shifts will the job be completed if workshop A works on only the first two shifts and both workshops work on the remaining shifts?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.