Algebra - math word problems - page 243 of 292
Number of problems found: 5832
- Second 5586
The first pump fills the pool in 12 hours. The second pump fills it in 15 hours. If all three pumps work, the pool will fill in 4 hours. How long will it take to fill the pool with only the third pump?
- Mixture 4673
We add 4 kg of tea to 2 kilograms of tea for 15 €, and we get the mixture for 12 €. How much is kg of second tea?
- Seamstresses 4635
Eight seamstresses have to complete the order in 16 days. After four days, the two seamstresses switched to another job. In how many days will the order be fulfilled?
- Grandma
Grandma is 57 years older than her two twin granddaughters. If we add the ages of an older woman with both granddaughters, we get the number 99. How old is her old woman?
- Two companies
Company A can fulfill the order in 12 days, and company B can fulfill the same order in 18 days. If only company A works on the order for the first two days and then both companies work on it for the remaining days, how many days will the order be fulfill
- Six painters
Six painters paint an area of 120 m² in 4 hours. How long does it take for 12 painters to paint 480 m² with the same performance?
- Granules
Katy had two dogs. The first one ate a pack of granules a week, and the other two times longer. Katka bought them two bags of granules. How long does it last for both dogs?
- Tractors
Wheel and belt tractors each day plow 8 ha of fields. The wheel tractors would have to work to plow 76 hectares for 12 days. Eight days with the belt tractor together. How many hectares do each day of each tractor?
- Workers
Two workers will construct the stage at the festival in 54 hours. Organizers need to shorten the assembly time by 42 hours. How many workers must the assembly company send?
- Children tickets
A ticket to the museum for children costs 10 SKK for adults and 20 SKK. Fifty people came to the museum and paid 700 SKK. How many children were there?
- Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job?
- Two pipes
One pipe fills one-fifth of the volume 20 minutes before my second one. The two pipes together will fill the tank in two hours. How long will each pipe fill the tank separately?
- Amazing number
An amazing number is a name for such an even number, the decomposition product of prime numbers has exactly three, not necessarily different factors, and the sum of all its divisors is equal to twice that number. Find all the amazing numbers.
- Workhorses
A team of colleagues did the work in 20 days. After adding two colleagues from the beginning, the team completed the work in 15 days. How many members has the colleague team?
- 2nd class variations
From how many elements can you create 5112 variations of the second class?
- Centimeters 66264
The average height of the basketball team's primary five players is 196 cm. The underscore player is 216 cm tall. What is the average height of the remaining four players in centimeters?
- The satellite
The satellite orbiting the Earth at an altitude of 800 km has a speed of 7.46 km/s. How long would it have to move from the start to the orbit to reach this speed if it evenly accelerated its motion in a straight line? What is the acceleration of satellit
- Two runners
Two runners ran simultaneously towards each other from locations distant 23.1 km. The average speed of the first runner was 1/7 higher than the average speed of the second runner. How long should each run a 23.1 km, if you know they meet after 58 minutes?
- Minutes 82967
The tank is filled with one inflow in 30 minutes, the other in 24 minutes. How many minutes will it take if both flows are open simultaneously?
Do you have unsolved problem that you need help? Ask a question, and we will try to solve it. Solving math problems.