- Plant order completion
Race A can fulfill the order in 12 days, and race B can fulfill the same order in 18 days. If both plants work together, how many days will the order be fulfilled? - Roofer work completion
Two roofers were to cover the roof in 14 days. After five days, they added one roofer. How long will it take them to complete the work? How many days will it take them to cover? - Weekend Cycling Distance
Peter cycled 24 kilometers on the weekend, twice as many on Saturday and Sunday. Thus, he cycled 24 kilometers more on Saturday than on Sunday. - Bedrich and Adam
When Bedrich is as old as Adam today, Adam will be 14 years old. When Adam was as old as Bedrich, Bedrich was two years old today. How old are Adam and Bedrich today? - Third pump
The first pump fills the pool in 12 hours. The second pump fills it in 15 hours. If all three pumps work, the pool will fill in 4 hours. How long will it take to fill the pool with only the third pump? - Free fall
How long does the stone fall freely into a depth of 80 m? What speed will it hit the bottom of the abyss? - Workers needed
The broad workers will do the job in 22.5 days. How many workers still need to be hired to do the job seven days earlier? - Tonic
One package tonic consumes Mom for 12 weeks and the daughter for 14 weeks. They use the same cream together for four weeks and then only their daughter. How many weeks endured tonic to daughter then? - Two tributaries
Two tributaries of the pool fill it in 10 hours. One of the tributaries would fill 15 hours. How long would fill the first tributary? - Bricklayers
Eight bricklayers build a house for 630 days. How many bricklayers must be added after 150 days to complete the building in (next) 320 days? - Apprentice
A worker and an apprentice can complete a job together in 6 hours. The worker alone can finish it in 10 hours. How long would the apprentice take alone? - Marathon training distance
Peter trains for a half marathon every day. He ran 1,000 m on the first day and increased the training length by 250 m daily. On a certain day, Peter ran 21 km in training. That day, he calculated the total distance he had run since the start of training. - Acceleration
The car accelerates at a rate of 0.5 m/s². How long does it travel 400 meters, and what will is its speed? - Combinations
How many elements can form six times more combinations of the fourth class than the combination of the second class? - Variation equation
Solve combinatorics equation: V(2, x+8)=72 V(2,x+8) is variations, second class, from x+8 items. - 2nd class combinations
From how many elements can you create 2346 combinations of the second class? - Set of coordinates
Consider the following ordered pairs that represent a relation. {(–4, –7), (0, 6), (5, –3), (5, 2)} What can be concluded about the domain and range for this relation? A. The domain is the y values of the ordered pairs. B. The range is the set of output v - Painter house help
Four painters painted the house in 14 days. How long will it take if 2 more come to help after 5 days? - Worker addition hours
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours? - Distance calculation
What is the distance from Prague to Mladá Boleslav if 40 km is eight-tenths of that distance?