  1. Four pavers
    tiles2_4 Four pavers would pave the square in 18 days. How many pavers do you need to add to done work in 12 days?
  2. The work
    clock-night-schr_17 The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?
  3. Three people
    clocks_16 Three people start doing a work at a same time. The first worked only 2 hours. The second ended 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, second 12 hours and 15 hours third. How many hours did it.
  4. Four workers
    wood_6 Four workers will lay the floor of the gym in six hours. After an hour of working together, one of the workers left to the doctor. How long before the remaining three workers finish their work?
  5. Lumberjacks
    stromy_17 Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
  6. Ten cashiers
    pokladna Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes?
  7. Inlet minus outlet
    inlets_6 Water flows into the tank through two pipes and flows out of the third pipe spontaneously. The pipe A itself would fill the tank in 3 hours, the pipe B itself would fille in 4 hours, and the pipe C itself would flow out in 12 hours. How long will the tank.
  8. Flowerbed
    flowers_9 Ondra digs the bed in 20 minutes. Cuba in 30 minutes. For how long do they dig together?
  9. Five mechanics
    car_37 Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time?
  10. Pumps
    pumps_8 After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?
  11. Construction of road
    truck_14 For the construction of the road dam, it is supposed to transport six trucks a total of 18 days. After three days, two more cars were sent to the construction site. How long will it take to carry the material?
  12. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  13. Pool
    pool If water flows into the pool by two inlets, fill the whole for 18 hours. First inlet filled pool 6 hour longer than second. How long pool is filled with two inlets separately?
  14. Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  15. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  16. Logic
    blue-barrel A man drinks a barrel of water for 26 days, woman for 48 days, for how many days they drink barrel together?
  17. Pipes
    water_pipe Water pipe has a cross-section 1087 cm2. An hour has passed 960 m3 of water. How much water flows through the pipe with cross-section 300 cm2 per 9 hours if water flow same speed?
  18. Tractors
    tractors Fields go plow two tractors with various performance. The first tractor plow whole field in 11 hours, the second tractor plow whole field 19 hours longer. How long take plow whole field with two tractors?
  19. Road repair
    workers_1 Road repair took 10 days for 36 workers if they worked 9 hours a day. How many days take repair same road 37 workers if they work 8 per day?
  20. Greenhouses
    sklenik Two workers would make installation of greenhouses for 54 hours. For how many hours does the installation 9 workers?

Do you have an interesting mathematical example that you can't solve it? Enter it, and we can try to solve it.